End of the second week

Work is on schedule as we come to the end of  week 2, and “The Beast” has been returned.  For all future work, Tom will use his own smaller 3 ton machine.

Angie talking to Tom about the garden
Angie talking to Tom about the garden

Materials for building the basement started to appear.

Mikael delivering timber for shuttering
Mikael delivering timber for shuttering

With the hole for the basement created,  David the surveyor arrived to set out the position of the new house.

David surveying teh site
David surveying the site
Setting out the new house
Setting out the new house

With the house set out the base of the hole was blinded to provide a flat firm surface on which to lay the insulation.

The basement set out in the hole
The basement set out in the hole
Delivering the sharp sand to blind the base
Delivering the sharp sand to blind the base

 

Leave a Reply

Your email address will not be published. Required fields are marked *