The timber frame should be delivered on Wednesday 13th August and installation start the next day. Before the floor goes in over the basement it was important to get a couple of large items down in the basement as they will be very difficult to get down the stairs.

Jim, James and Simon from Oxford Renewables
Jim, James and Simon from Oxford Renewables

 

Positioning the thermal store
Positioning the thermal store

The team from Oxford Renewables delivered the wood pellet boiler which includes a 550 litre thermal store (Solarfocus OctoPlus 15 Р http://www.oxfordrenewables.co.uk/octoplus).

They also helped with the safe which is to be installed downstairs.

Picking up the safe
Picking up the safe
Lowering the safe
Lowering the safe