The basement requires approximately 560 cubic metres of chalk to be dug of which about 200 cubic metres is used as back fill once the basement is complete. So 300 cubic metres is either taken away at great expense or used to level the very sloping garden.

 

The 2.8m trench into the chalk is no problem
The 2.8m trench into the chalk is no problem

A good few days to dig out all the material.