Work starts on the frame

Adam & Glen from Touchwood homes arrived on site Tuesday as the advance party to start erecting the timber frame. It was raining when they arrived but that didn’t stop them.

Adam & Glen arrive
Adam & Glen arrive

They sorted out the components from pack 1 and started fitting them. These plates will be resin bonded to the walls and carry the ground floor / basement ceiling.

Fixing the floor plate
Fixing the floor plate

Next is the wall plate which sits on top of the basement and has to be level and sealed air-tight!

One huge jigsaw puzzle
One huge jigsaw puzzle
Floor and wall plates fixed
Floor and wall plates fixed